PPR 90 Degree Elbow Fittings PPR Pipes Fittings UAE Dubai
|
Still deciding? Get samples of $ !
Request Sample
|
Product Details
| Customization: | Available |
|---|---|
| Type: | Equal or Reducing |
| Connection: | Female |
Manufacturer/Factory & Trading Company
360° Virtual Tour
Diamond Member Since 2010
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Years of Export Experience
Experienced Team
OEM Services
Standardized quality control
The export experience of the supplier is more than 10 years
The supplier has %s1 foreign trading staff(s) and %s2 staff(s) with over 6 years of overseas trading experience
The supplier provides OEM services for popular brands
The supplier has a complete and standardized quality control process, check the %arLink for more information
Sign In to see all verified strength labels (26)
Find Similar Products
Basic Info.
- Model NO.
- BN08
- Material
- CPVC
- Shape
- Equal Tee and Reducing Tee
- Lateral
- 90°Tee
- Head Code
- Round
- Wall Thickness
- SCH40
- Finish
- Plastic
- Technics
- Injection
- Pressure Rating
- 2000LBS
- Standard
- ASTM
- Certification
- ISO, CE
- Coloe
- Green or Gray
- Installation
- Connection with CPVC Glue
- Brand Name
- Sam-UK
- Transport Package
- Carton and Nylon Bag
- Specification
- 1/2", 3/4", 1"
- Trademark
- SAM-UK
- Origin
- China(Mainland)
- HS Code
- 3917400000
- Production Capacity
- 999999 Pieces / Month
Product Description
PRODUCT DISPLASY
PRODUCT FEATURES
SAM-UK PIPE,QUALITY ASSURANCE
1. SAM-UK PPR pure raw material, there is no pungent smell when they are connected. It only produce carbon dioxide and water after combustion.
2. Product advantages: Light material ; good temperature and pressure stability; safe connection, reliable and convenient performance, ; small friction in pipe system; good hydraulic conditions; healthy performance, no odor, environmental and healthy; excellent noise insulation and chemical resistance.
pipeline connection technology:
Since the outermost layer of PP-R pipe materials, high-performance fiber composite pipe PP-R pipe fittings available hot-melt socket connection forming a pipeline system. When connected, requiring melt temperature reached to 260 degrees Celsius, pipe and fittings for surface cleaning after a suitable time while heating the fuser and can be plugged low melt connection cost, simple operation, safe and reliable.It can effectively prevent the occurrence of junction leakage.
special reminder:
Pipe and fittings are used for the connection,which are provided by "SAM-UK". Because different manufacturers may differ from the choice of materials. So it is unable to be guaranteed the quality of the welding connection. Strongly recommended to use special hot-melt welding equipment with temperature control, to prevent welding too hot or too cold, which may affect the quality of welding.
SAM-UK PPR pipe, Green, safe and reliable
Mainly our raw materials are imported.And our products are manufactured by professional equipment. Professional design and every detail of pipe fittings, piping system,we keep each step. They are safe, secure, reliable and effective solution to the hidden home improvement project;they are easy to leak pipes, burst pipes and other hazards.
Production process and line control
Orderly management workshop
Precautions
Hydrostatic pressure test
During our decoration, after the completion of welding pipes,we need inspect the quality of pipes, that is we often say the pressure test. The construction of pipes belongs to hidden works in the decoration. Once hidden engineering problems appear, the consequences is incalculable. If the pipe is buried in the ground or floor tiles, the cost of reconstruction will be quite large.
1. Pipes installed, the appearance check is qualified, then the pressure test can be carried out;
2. hot melt or fused connection pipe, the hydrostatic test after 24 hours of the connection;
3. Medium is clean water at room temperature. When in a large system, it can be layered, parted to test the pressure.
Water pressure / method:
1. The hot and cold water connected together by hose. Then hot and cold water forms a ring, pressure testing device connected to any outlet,the pressure pointer is 0. When all the water pipelines installed, the the pressure test could begin. To block all of the plugs and close the water inlet valve manifold before the test.
2. When we do the test, shake the jack lever until the gauge pointer around 0.9-1.0, it is also said that the present pressure is three times than the normal water pressure.
3.Keep this pressure value for a certain time, Different time ,the water load time is different, PPR, aluminum PPR, PPR and other steel-plastic pipe welding time is 30 minutes. Aluminum pipe, that's also the galvanized pips, it needs 4 hours.
PPR pipeline construction safety:
1.PPR pipe cross resistance to ultraviolet radiation, not suitable for outdoor surface mounted installation. If they really need, you need to take shielding measures.
2. PPR pipe's low temperature impact resistance is poor, it should be vent pipes to prevent freezing, swelling
and crack the pipes in winter.
3. Waterproof toilet area, often using asphalt and other petrochemical substances. When it is doing waterproof needs shelter on pipeline protection.
PRODUCT FEATURES
SAM-UK PIPE,QUALITY ASSURANCE
1. SAM-UK PPR pure raw material, there is no pungent smell when they are connected. It only produce carbon dioxide and water after combustion.
2. Product advantages: Light material ; good temperature and pressure stability; safe connection, reliable and convenient performance, ; small friction in pipe system; good hydraulic conditions; healthy performance, no odor, environmental and healthy; excellent noise insulation and chemical resistance.
pipeline connection technology:
Since the outermost layer of PP-R pipe materials, high-performance fiber composite pipe PP-R pipe fittings available hot-melt socket connection forming a pipeline system. When connected, requiring melt temperature reached to 260 degrees Celsius, pipe and fittings for surface cleaning after a suitable time while heating the fuser and can be plugged low melt connection cost, simple operation, safe and reliable.It can effectively prevent the occurrence of junction leakage.
special reminder:
Pipe and fittings are used for the connection,which are provided by "SAM-UK". Because different manufacturers may differ from the choice of materials. So it is unable to be guaranteed the quality of the welding connection. Strongly recommended to use special hot-melt welding equipment with temperature control, to prevent welding too hot or too cold, which may affect the quality of welding.
SAM-UK PPR pipe, Green, safe and reliable
Mainly our raw materials are imported.And our products are manufactured by professional equipment. Professional design and every detail of pipe fittings, piping system,we keep each step. They are safe, secure, reliable and effective solution to the hidden home improvement project;they are easy to leak pipes, burst pipes and other hazards.
Production process and line control
Orderly management workshop
Precautions
Hydrostatic pressure test
During our decoration, after the completion of welding pipes,we need inspect the quality of pipes, that is we often say the pressure test. The construction of pipes belongs to hidden works in the decoration. Once hidden engineering problems appear, the consequences is incalculable. If the pipe is buried in the ground or floor tiles, the cost of reconstruction will be quite large.
1. Pipes installed, the appearance check is qualified, then the pressure test can be carried out;
2. hot melt or fused connection pipe, the hydrostatic test after 24 hours of the connection;
3. Medium is clean water at room temperature. When in a large system, it can be layered, parted to test the pressure.
Water pressure / method:
1. The hot and cold water connected together by hose. Then hot and cold water forms a ring, pressure testing device connected to any outlet,the pressure pointer is 0. When all the water pipelines installed, the the pressure test could begin. To block all of the plugs and close the water inlet valve manifold before the test.
2. When we do the test, shake the jack lever until the gauge pointer around 0.9-1.0, it is also said that the present pressure is three times than the normal water pressure.
3.Keep this pressure value for a certain time, Different time ,the water load time is different, PPR, aluminum PPR, PPR and other steel-plastic pipe welding time is 30 minutes. Aluminum pipe, that's also the galvanized pips, it needs 4 hours.
PPR pipeline construction safety:
1.PPR pipe cross resistance to ultraviolet radiation, not suitable for outdoor surface mounted installation. If they really need, you need to take shielding measures.
2. PPR pipe's low temperature impact resistance is poor, it should be vent pipes to prevent freezing, swelling
and crack the pipes in winter.
3. Waterproof toilet area, often using asphalt and other petrochemical substances. When it is doing waterproof needs shelter on pipeline protection.
Send your message to this supplier
People who viewed this also viewed
Product Groups
More
Find Similar Products By Category
- Supplier Homepage
- Products
- PIPE FITTING
- PPR FITTINGS
- PPR 90 Degree Elbow Fittings PPR Pipes Fittings UAE Dubai
Related Categories
Hot Searches
More