• PPR Plastic 45 Dge Elbow
  • PPR Plastic 45 Dge Elbow

PPR Plastic 45 Dge Elbow

Connection: Glue
Shape: Equal
Head Code: Round
Angle: 30 Degree
Wall Thickness: Sch120
Material: Plastic
Customization:
Diamond Member Since 2010

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
B03
Technics
Injection
Color
Do as Customs Like
Brand Name
Sam-UK
Size
4′′
Item No
D06
Centification
Ce, ISO 9001
Place of Origin
Zhejiang, China
Tempereture
-10--55
Transport Package
Carton or Bag
Specification
ASTM D2655
Trademark
SAM-UK
Origin
Huangyan, Taizhou, Zhejiang, China
HS Code
39174000
Production Capacity
200000 PCS/Month

Product Description

FACTORY PIPE FITTING 45 dge Elbow
1. Model number: B03
2. Brand name: Sam-UK
3. Standard: DIN
4. Color: Green

Properties:
1) Healthy, bacteriological neutral, conforming to drinking water standards
2) Resistant to high temperatures, good impact strength
3) Convenient and reliable installation, low construction expenses
4) Excellent heat-insulation property from minimum thermal conductivity
5) Lightweight, convenient to transport and handle, good for labor-saving
6) Smooth inner walls reduce pressure loss and increase flow speed
7) Sound insulation (reduced by 40% compared to galvanized steel pipes)
8) Light colors and excellent design ensure suitability for both exposed and hidden installation
9) Recyclable, environment-friendly, accords with GBM standards
10) Extremely long usage life for at least 50 years
 

Items  
 

Descriptions  
 

Material
 

PVC-U , PPR
 

Products
 

Pipelines for water supply and drain ,Female and male Coupling ,Socket, Cap , Tee , Adapter , Elbow , Reducer, Union , Plug , Pipe Clip , Valve , Plastic Tap and Mould
 

Size
 

1/2 - 8''         20-200mm
 

Standard
 

ASTM D2466, ASTM D2665 , BS4346, NBR5648, DIN8078 / 8077
 

Machines
 

injection machines
 

Colors
 

white and gray for PVC products , green ,grey, white and blue for PPR products
 

Working place
 

PVC -15°-60°,  PPR-20°-95°
 

Warranty
 

at least 50 years
 

Delivery time
 

30-40 days
 

We have a mould workshop also we can make mould
 
 Our Business Steps
1)Communication: customers interest in our products , discuss price , check sample quality
2)Negotiation : talking about the sizes, quantity , and other details
 3)Ordering: settle down and place order to us
 4)Producing: after orders , we start productions at once
 5)Packing: while products come out of machines then packed
 6)Delivery : everything gets ready ,place the ship, send to dock , to be shipped

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now